Skip to content

Plan Your Journey

Timetables & Maps

    • 1
    • 1A
    • 1B
    • 1C
    • 1D
    • 1N
    Harrogate to Aspin, Eastfield, Carmires, and The Pastures
    Tuesday 12th November: Roadworks in Knaresborough

    Temporary traffic lights 🚦 & water main work 🚰 on Boroughbridge Road between Tentergate Road and High Street. Also York Road near Archers Meadow. Delays likely on the 1A/B/C/D & the 21. Sorry for any inconvenience caused.

    The Pastures Resurfacing

    The Pastures road resurfacing is taking place from Monday 18 November to Sunday 1 December. Whilst the resurfacing takes place the 1D is not able to reach The Pastures, head over to the stop on Boroughbridge Road instead. We're really sorry for any inconvenience.

    • 2A
    • 2B
    Harrogate Electrics
    Harrogate to Bilton Circular via King Edwards Dr, Dene Park, Fountains Avenue
    0 reported issues
    • 3
    Harrogate Electrics
    Harrogate to Jennyfield Circular
    0 reported issues
    • 6
    • X6
    Harrogate Electrics
    Harrogate to Pannal Ash Circular
    0 reported issues
    • 7
    Harrogate to Leeds via Wetherby
    0 reported issues
    • 8
    Harrogate to Wetherby via Knaresborough
    0 reported issues
    • 21
    Knaresborough to Roecliffe via Flaxby, Staveley, Boroughbridge
    Tuesday 12th November: Roadworks in Knaresborough

    Temporary traffic lights 🚦 & water main work 🚰 on Boroughbridge Road between Tentergate Road and High Street. Also York Road near Archers Meadow. Delays likely on the 1A/B/C/D & the 21. Sorry for any inconvenience caused.

    • 24
    Harrogate Electrics
    Harrogate to Pateley Bridge

    Significant delays on the 24 & 36

    There are significant delays on the 24 & 36 because of roadworks. Long delays & queuing traffic on Ripon Road both ways around Otley Road. Congestion to Nidd Lane heading Southbound & Skipton Road heading North bound. In the roadworks ⚒️ area. Expect delays on the 36 Ripon services in both directions. Delays of 45 mins impacting Leeds services too.

    • 36
    Ripon to Leeds via Harrogate, Harewood

    Roadworks at Moortown Corner

    As part of the Connecting Leeds project, there are roadworks taking place at Moortown Corner for around 16 weeks from 28 October. We'll still be able to use our normal route through Moortown, but there may be delays through the area at busy times. Thanks for bearing with us.

    Significant delays on the 24 & 36

    There are significant delays on the 24 & 36 because of roadworks. Long delays & queuing traffic on Ripon Road both ways around Otley Road. Congestion to Nidd Lane heading Southbound & Skipton Road heading North bound. In the roadworks ⚒️ area. Expect delays on the 36 Ripon services in both directions. Delays of 45 mins impacting Leeds services too.

    • 727H
    Jennyfield to Harrogate Grammar School via Bilton
    0 reported issues
    • 780H
    • 781H
    Jennyfield to Rossett School
    0 reported issues
    • 782H
    Bilton to Rossett School
    0 reported issues
    • 783H
    Bilton to Rossett School
    0 reported issues
    • 784H
    Bilton to Rossett School
    0 reported issues